Zensol
Client login :
 
french
 
 
 

Featured products

Timing Tests

CONTENT

1  
2
 
3
 
4
 
INTRODUCTION THE CIRCUIT BREAKER CIRCUIT BREAKER TIMING TESTS DATA ANALYSIS
       

3.1 Definition
3.2 Importance
3.3 Description
3.3.1 Installation and connection
3.3.1.1 General rules
3.3.1.2 Connection description
3.3.1.3 Mirror effect
3.3.2 Data acquisition
3.3.3 Data interpretation
3.4 Circuit breaker operating times
3.5 General definitions
3.5.1 Interrupting element (or unit)
3.5.2 Pole
3.5.3 Main contacts
3.5.4 Auxiliary contacts
3.5.5 Arcing contacts
3.5.6 Indicating contacts
3.5.6.1 "a" contact
3.5.6.2 "b" contact
3.6 Timing reference
3.7 Time definitions according to IEC 56 international standard
3.7.1 Opening time (IEC 56 3.105.32)
3.7.2 Closing time (IEC 56 3.105.35)
3.7.3 Open-Close time, O-C or isolation time (IEC 56 3.105.38)
3.7.4 Close-Open time, C-O or short-circuit time (IEC 56 3.105.42)
3.7.5 Minimum trip duration (IEC 56 3.105.44)
3.7.6 Minimum close duration (IEC 56 3.105.45)